Duct Works in Dubai — Manufacturing, Installation, Modification

In-house duct workshop. We fabricate galvanised sheet metal ducts to your spec — standard rectangular, transitions, takeoffs, dampers, plenum boxes — and install, modify, insulate or clean them ourselves. Most Dubai contractors outsource fabrication; we don't.

4.8 · 150+ Google reviews In-house workshop 1–3 day fabrication turnaround 6-month workmanship warranty
In-house Duct Workshop
Manufacture · install · modify · insulate SMACNA-aligned · 1–3 day standard turnaround

What we do

End-to-end duct scope under one roof — from sheet-metal cutting in our workshop to commissioning on site.

check_circle

Duct Manufacturing

Galvanised sheet metal ducts fabricated to spec — rectangular, round (where required), transitions, takeoffs, dampers, access doors, plenum boxes. SMACNA-aligned standards. Most standard runs ship 1–3 working days from drawing approval.

check_circle

Duct Installation

New duct installation for fit-outs, renovations, layout changes. Hangers, supports, joint sealing, balancing dampers, terminal connections. Coordinated with the rest of the MEP scope.

check_circle

Duct Modification & Re-routing

Moving duct runs during fit-outs, rezoning offices, adding or removing branches, connecting new tenancies. We re-balance the system after modification — most contractors skip this, which is why rooms run hot or cold after a fit-out.

check_circle

Duct Insulation

Fibreglass for internal runs, Armaflex / Aeroflex elastomeric for runs through unconditioned spaces, fire-rated insulation where DCD or building regulations require. Foil-faced where vapour barrier needed.

check_circle

Duct Cleaning

HEPA-filtered negative pressure, branch-by-branch mechanical brushing, anti-bacterial finish. Separate service for existing systems.

Why in-house manufacturing matters

Most Dubai contractors order ducts from a third-party fabricator in Al Quoz or Jebel Ali. Adds 5–10 working days to a fit-out timeline and 15–25% to the duct line item. We run the workshop ourselves.

schedule

Lead time

1–3 days for standard fabrication, instead of 7–14. Critical when the rest of the fit-out is waiting on duct delivery.

savings

Margin

We cut out the middleman markup. Same SMACNA spec, lower per-square-metre cost.

verified

Quality control

One team is responsible for fabrication AND installation. No blame-shifting if joints fail or dimensions drift.

tune

Modification flexibility

Last-minute changes during install — a re-routed beam, a moved partition — handled same-day from the workshop.

Standards we work to

check_circle

SMACNA-aligned construction

Rectangular and round ducts to SMACNA standards for joint construction, reinforcement spacing, and pressure class.

check_circle

Galvanised steel by pressure class

Correct steel gauge specified per duct dimension and pressure class — 16ga, 18ga, 20ga as required.

check_circle

Sealed joints

Joint sealing to DCD-compliant standards where required. Mastic and tape per spec for class and leakage requirements.

check_circle

DCD smoke-management coordination

Coordinated with Dubai Civil Defence smoke-management requirements for fire-rated zones. Smoke dampers, fire dampers, fire-rated penetrations as specified.

check_circle

Energy-aware insulation

Insulation thickness per project spec and Dubai Municipality energy guidelines. Foil-faced vapour barriers where condensation risk warrants.

How we price duct work

Per square metre of duct surface area for fabrication and installation. Insulation priced separately. Modification work priced by scope and complexity. Site survey + drawing review first; written BOQ within 3–5 working days.

tune

Typical price drivers

  • Gauge required (16ga vs 18ga vs 20ga)
  • Insulation type and thickness
  • Access — open ceiling vs tight plenum
  • Coordination — single-trade vs co-ordinated MEP
  • Fire-rating requirements

Send drawings for a duct quote

WhatsApp your CAD drawings or rough sketches with dimensions, gauge spec, and insulation requirements. We review and issue a written BOQ within 3–5 working days.