Clinic Refurbishment in Dubai

Refurbishment and upgrade work for operating Dubai clinics — aesthetic, beauty, dental and medical. Operational continuity is the priority. We phase the work so reception and unaffected treatment rooms keep operating while we refurbish the rest. DHA-aware specification, infection-control finishes, 2–6 week handover for most scopes. Fixed-price written quotes. 6-month workmanship warranty.

4.8 · 150+ Google reviews 9,000+ jobs since 2019 Founded 2019 · 15+ team 6-month workmanship warranty
Clinic Refurbishment Dubai
Aesthetic · beauty · dental · medical Operational-continuity scheduling · DHA-aware · 2–6 week turnaround

Refurbishment scope we deliver

Interior finishes, treatment-room upgrades, MEP, specialist trades and operational-continuity scheduling. One in-house team across every trade.

check_circle

Interior finishes

Anti-bacterial wall paint and easy-clean wall finishes, hygienic seamless flooring (vinyl, ceramic, marble) with no joint failure points, ceiling refresh — gypsum, tiled, acoustic. Wall cladding, decorative finishes and signage zones.

check_circle

Treatment-room upgrades

Cabinetry and built-in storage tailored to clinical workflow. Reception desks and waiting-area joinery. Treatment beds, equipment counters and instrument storage cabinetry.

check_circle

MEP upgrades

AC zoning and capacity upgrades for treatment rooms. Clinical-grade LED lighting — dimmable, colour-accurate for aesthetic treatment work. Power-point and data-point repositioning for new equipment layouts. Plumbing for treatment-room sinks, sterilisation areas and pantries.

check_circle

Wet-area waterproofing

Wet-area waterproofing for treatment rooms and sterilisation areas. Sika and BASF systems. Critical for hygienic flooring longevity.

check_circle

Painting and decorative finishes

Anti-bacterial wall paint, decorative wall finishes, brand colour roll-out across treatment rooms and reception. Jotun and Dulux systems.

check_circle

Compliance and continuity

DHA-aware specification, DM compliance for water and waste, DEWA load coordination for new equipment, phased scheduling, dust-controlled barriers between operational and works zones, after-hours and weekend work where required.

check_circle

Clinic AMC after handover

Most clinic clients transition into a Clinic AMC after refurbishment — bi-monthly visits, water tank cleaning, faster response SLAs and DHA-aware servicing.

Named clinic clients on our books

Used with permission. Operating aesthetic clinics in Dubai we refurbish and maintain. References available after proposal stage with the client's written consent.

Sakura Beauty Caya Barvikha

How we work with clinics

Five-step process designed around operational continuity. Most refurbishments run in 3–4 phases.

Operational audit + scope discussion

Site visit during clinic hours to understand patient flow, treatment-room scheduling, equipment placement and regulatory requirements. Free.

Phased scope plan + written quote

Within 5 working days. Detailed line-item BOQ, phased schedule, daily-impact projection (which treatment rooms are affected when), fixed price.

Approval + DM coordination

We handle DM coordination where the scope requires it. You handle clinic-internal approvals (clinical lead, ownership). DHA approvals stay between you and the regulator; our spec supports DHA-aligned operations.

Phased execution

Most refurbishments run in 3–4 phases. Each phase is dust-controlled, operationally segregated and completed within 5–10 working days.

Handover + Clinic AMC option

Walk-through, snag list resolved, photo handover. Most clinic clients then transition into a Clinic AMC for ongoing maintenance.

How we price clinic refurbishment

Fixed-price written BOQ after site survey. VAT-registered invoicing. Phased payment schedule aligned with phased delivery.

tune

Indicative brackets

  • Single treatment-room refurbishment: AED 25,000–60,000
  • Reception + waiting area refresh: AED 35,000–90,000
  • Four to six treatment-room clinic full refurbishment: AED 250,000–600,000
  • Clinic relocation fit-out (new premises): quoted on site survey
forum

How to get a quote

WhatsApp the clinic name, location and a short scope note. We arrange a site visit during clinic hours and issue a phased BOQ within 5 working days of the survey.

Workmanship and material warranties

Two layers across every clinic refurbishment. Workmanship is ours across all trades; material warranties on finishes, MEP and joinery pass through from each manufacturer.

workspace_premiumWorkmanship warranty

6-month workmanship warranty — if the same issue returns within 6 months due to our work, we fix it at no cost. Covers labour only.

Single warranty across painting, joinery, MEP, waterproofing and finishes. One accountability line for the clinic.

verifiedMaterial warranties

Manufacturer warranties on paint systems, flooring, AC equipment, lighting, sanitaryware and joinery pass through to you directly — typically 0 to 10 years depending on the product. We confirm exact terms before work begins.

JotunDuluxSikaDaikinPhilipsABBSchneiderGeberit

Brief us on your clinic refurbishment

WhatsApp the clinic name, location and a short scope note. Free site visit during clinic hours. Phased written BOQ within 5 working days of the survey. References from Sakura Beauty, Caya and Barvikha available after proposal stage.