Duct Modification & Re-Routing in Dubai

Duct modification and re-routing for office fit-outs that don't match the original AC zoning, tenant changes that need new branches, layout changes during renovation, and HVAC system expansion. In-house duct workshop fabricates the new sections to spec. System re-balance after modification is included.

4.8 · 150+ Google reviews 9,000+ jobs since 2019 In-house duct workshop 6-month workmanship warranty
Duct Modification
Re-route · re-zone · re-balance Fit-outs · tenant changes · expansion · 6-month workmanship warranty

What we modify

Common modifications, re-zoning of existing runs and brand-new branch additions. New sections fabricated in our own workshop in 1–3 working days.

check_circle

Re-route around new partitions

Moving a duct run during office fit-out to clear a new partition wall, glass front or feature element without compromising airflow.

check_circle

Add a branch to a new zone

New tap-off from existing supply duct to serve a new room or zone, with VCD and access door. Sized to existing trunk capacity.

check_circle

Remove a redundant branch

Removing a branch from a wall being demolished, capping cleanly at the trunk and re-balancing the remaining system.

check_circle

Re-zone an existing run

Adding VCDs to split one run into multiple zones, adding VAV or CAV terminal boxes for variable load, re-tying tenant zones during sub-leasing.

check_circle

Replace a damaged section

Replacing corroded, leaking or impact-damaged duct sections with newly fabricated matching gauge and dimensions. Same-day for small scope.

check_circle

Upgrade for new load

Upgrading duct gauge, dimensions or insulation when an HVAC load increase or system change pushes the existing duct beyond spec.

check_circle

Re-balance and commissioning

Air balance with calibrated anemometer, damper position documentation, before/after airflow readings at every affected diffuser, balancing report.

Why re-balance after modification matters

Most duct modifications change the system's pressure profile. Without re-balancing, the modified branch will be under- or over-supplied — and other rooms on the same trunk will be affected too. Most post-modification complaints trace back to a contractor who didn't re-balance.

Pressure profile shifts

Adding or removing a branch changes static pressure across the whole trunk. Untouched rooms get more or less air than they used to.

Calibrated readings

We take before/after airflow readings at every affected diffuser with a calibrated anemometer — not visual or audible checks.

Documented dampers

Final damper positions are documented so future modifications start from a known state, not a guess.

Handover-ready report

Balancing report shared with the building MEP team or landlord so the modification is signed off cleanly.

How we price duct modification

Fixed-price written quote after site survey or against your existing drawings. Re-balancing and commissioning report included in the quote — not an extra.

tune

Indicative price brackets

  • Single branch addition or removal: AED 1,500–5,500
  • Re-routing existing duct (per linear metre): AED 250–650
  • Re-zoning with VCD addition: AED 2,500–8,500
  • Office fit-out duct modification (2,000–5,000 sqft): AED 8,500–35,000
  • Re-balance and commissioning report: AED 2,500–12,000

6-month workmanship warranty

Joint failures, seam splits and modification errors traceable to our work are covered for 6 months. Covers labour and remake. Manufacturer warranties on dampers and equipment pass through to you directly — 0 to 10 years depending on the product.

Get a duct modification quote

WhatsApp existing drawings and a description of the change you need. For larger scope we book a site survey. Quote back within 2–5 working days, including re-balancing.