Cooling Tower Maintenance in Dubai

Cooling tower maintenance and repair for water-cooled chiller systems across Dubai. Descaling, water chemistry, drift eliminator inspection, fill replacement, fan and gearbox servicing, Legionella risk management aligned with Dubai Municipality water-safety expectations.

4.8 · 150+ Google reviews 9,000+ jobs since 2019 In-house cooling tower team 6-month workmanship warranty
Cooling Tower Maintenance
Descale · Water treatment · Repair Chilled-water buildings · process cooling · 6-month workmanship warranty

What we cover

Scheduled maintenance, repair scope, and Legionella risk management — documented for building owner and insurer audit.

check_circle

Water chemistry and scale control

Testing and treatment programme covering scale, corrosion and biological control. Descaling of the condenser water side when deposits begin to affect approach temperature.

check_circle

Drift eliminator and fill media

Inspection of drift eliminators and fill media on every service. Replacement when fouling, degradation or biological growth is past treatment. Full fill replacement on overhaul.

check_circle

Fan, gearbox and drive

Fan blade and hub inspection, gearbox oil change and vibration check, belt tension and pulley alignment. Fan motor and gearbox replacement or overhaul where condition requires.

check_circle

Basin, distribution and nozzles

Basin cleaning and sediment removal, make-up water valve service, distribution piping inspection and repair, spray nozzle cleaning and replacement.

check_circle

Legionella risk management

Quarterly bacteriological testing, disinfection during routine maintenance, documentation aligned with Dubai Municipality water-safety guidance. Records formatted for building owner and insurer audit.

check_circle

Repair and overhaul

Fan motor replacement, gearbox overhaul, drift eliminator and fill media replacement, distribution piping repair, basin liner repair. Quoted on site survey.

Why cooling tower maintenance is non-optional

A neglected cooling tower drops chiller plant efficiency 20–40%, accelerates chiller compressor wear, and creates Legionella risk in standing water. The cost of neglect compounds — higher DEWA bills, premature chiller failure, and liability exposure if a Legionella case is traced to your building.

Efficiency loss

Scale and fouling raise condenser water temperature, which pushes chiller compressor work. Plant efficiency falls 20–40% across a season of neglect.

Chiller wear

Higher condenser pressures shorten compressor life. A premature chiller overhaul costs more than years of tower maintenance.

Legionella risk

Standing water and biological fouling create conditions for Legionella growth. A documented programme is the only defensible position.

How we price cooling tower work

Fixed-price written quote after site survey. Quarterly service contracts available with reduced rates and priority response.

tune

Indicative price brackets

  • Single cooling tower quarterly service: AED 3,500–12,000
  • Annual descaling programme: AED 12,000–45,000
  • Drift eliminator replacement: AED 4,500–18,000
  • Fill media full replacement: AED 15,000–60,000
  • Full cooling tower overhaul: quoted on site survey

6-month workmanship warranty

If the same issue returns within 6 months due to our work, we re-do it at no cost. Covers labour. Manufacturer warranties on parts, chemicals and equipment pass through to you directly — 0 to 10 years depending on the product.

Get a cooling tower quote

WhatsApp us tower specs and recent test reports, or book a site survey. We come back with a written scope and price, then schedule around your plant operations.