Licensed & insured 4.8 rating on Google 10,000+ jobs completed Open 24/7

Duct Manufacturing in Dubai

Galvanised sheet metal ducts fabricated to your spec in our own in-house workshop. Rectangular, transitions, takeoffs, dampers, access doors, plenum boxes. SMACNA-aligned construction. Most standard runs ship in 1–3 working days from drawing approval.

★ 4.8 · 150+ Google reviews 10,000+ jobs since 2019 In-house duct workshop 6-month workmanship warranty
Samra Facilities in-house galvanised sheet metal duct workshop in Dubai
Fabricated · sealed · ready to install SMACNA-aligned · 1–3 day standard turnaround · 6-month workmanship warranty

AC duct fabrication, and who this page is for

This is the fabrication side of AC ducting work. If you are a fit-out or MEP contractor pricing a duct package, or a building team replacing a run, you send drawings and we send back fabricated AC duct. If you also need it hung, sealed and balanced on site, that is AC duct installation. If the existing ducting is sound and the problem is what has built up inside it, that is AC duct cleaning.

Materials. Galvanised iron sheet is the default and covers most of what leaves the workshop. Stainless and aluminium are fabricated where a specification calls for them, which is usually kitchen extract, wet areas and corrosive environments. Tell us which the specification names and we confirm it against the drawing before anything is cut.

Standards. Construction follows SMACNA, as set out above. Where a consultant specifies DW144 instead, flag it at tender stage rather than after fabrication, because the gauge schedule and the joint classification differ between the two documents and that changes the cut list, not just the paperwork. Fire and smoke dampers are DCD approved types.

What we fabricate

We work to your drawings — DWG, PDF or BOQ. Send them on WhatsApp or email and we come back with a fabrication quote within 2–5 working days.

Rectangular and round ducts

Standard galvanised rectangular ducts from 26ga to 16ga, gauge matched to dimensions and static pressure. Round ducts where spec calls for them.

Transitions, offsets, elbows, takeoffs

Fabricated to drawing, with 90° and 45° takeoffs, custom transitions and offsets for tight ceiling voids and field-fit conditions.

Dampers and fire dampers

Manual and motorised dampers, volume control dampers (VCDs), DCD-approved fire dampers and smoke dampers — supplied with access doors at every junction.

Plenum boxes and diffuser collars

Custom plenum boxes for AHUs and terminal units, diffuser collars sized to grille spec, transitions to match existing trunk dimensions.

Spiral ducts

Spiral ducts where exposed-spec installs require a clean visible finish — restaurants, retail and architectural ceilings.

Sealed-joint construction

TDC, TDF and slip-and-drive joint systems sealed for DCD compliance. Insulation-ready outer surface, clean and deburred for foil or elastomeric application.

Materials and standards we fabricate to

Galvanised steel (GI) to the gauge the duty requires: 24 gauge for low pressure and small sizes, 22 gauge through the mid range, 20 gauge on large or high pressure runs. Pre-insulated (PI) panel where the void is tight or the programme is short. Spiral and round for exposed runs.

Seams and joints by Pittsburgh lock, with TDF or TDC flanged connections rather than slip and drive where the specification calls for it. Cutting on an automated coil line, with plasma for fittings and transitions.

Fabricated to DW144, the standard most Dubai specifications reference, or to SMACNA where a US specified project calls for it. We state which on the submittal rather than leaving it to be discovered at inspection.

Standard lead times

Outsourced duct fabrication in Dubai typically runs 7–14 working days for standard scope. We do most of the same scope in 1–3 days because the workshop is ours.

Small modification

One transition, one takeoff — 1–2 working days.

Apartment fit-out duct run

2–3 working days from approved drawing.

Office fit-out (2,000–5,000 sqft)

3–7 working days depending on complexity.

Large commercial fit-out (10,000+ sqft)

7–14 working days, often split into staged deliveries to suit programme.

Custom plenums and specials

Add 2–4 working days. Rush turnaround available for critical-path fit-outs — flag it on the WhatsApp quote.

How we price duct manufacturing

Per square metre of duct surface area for fabrication. Installation priced separately or as part of an MEP scope. Dampers, fire dampers and access doors priced per unit.

What drives the price

  • Gauge required — heavier gauge raises material cost
  • Complexity — transitions and offsets cost more than straight runs
  • Quantity — volume discounts apply on larger jobs
  • Access doors, dampers and special detailing — per unit
  • Lead time — rush turnaround priced higher

Who we fabricate for

  • Fit-out contractors who want reliable fabrication without a third-party middleman
  • MEP contractors outsourcing duct scope
  • Property owners running their own fit-out
  • Restaurant and retail operators during renovation
  • Building MEP teams during modification or expansion

6-month workmanship warranty

Joint failures, seam splits and dimensional errors traceable to our fabrication are covered for 6 months. Covers labour and remake. Manufacturer warranties on dampers and accessories pass through to you directly — 1 to 10 years depending on the product.

Send drawings for a fabrication quote

WhatsApp or email your DWG, PDF or BOQ and we come back with a written fabrication quote within 2–5 working days. Standard runs ship in 1–3 working days from drawing approval.

Chat on WhatsApp