Duct Manufacturing in Dubai
Galvanised sheet metal ducts fabricated to your spec in our own in-house workshop. Rectangular, transitions, takeoffs, dampers, access doors, plenum boxes. SMACNA-aligned construction. Most standard runs ship in 1–3 working days from drawing approval.
What we fabricate
We work to your drawings — DWG, PDF or BOQ. Send them on WhatsApp or email and we come back with a fabrication quote within 2–5 working days.
Rectangular and round ducts
Standard galvanised rectangular ducts from 26ga to 16ga, gauge matched to dimensions and static pressure. Round ducts where spec calls for them.
Transitions, offsets, elbows, takeoffs
Fabricated to drawing, with 90° and 45° takeoffs, custom transitions and offsets for tight ceiling voids and field-fit conditions.
Dampers and fire dampers
Manual and motorised dampers, volume control dampers (VCDs), DCD-approved fire dampers and smoke dampers — supplied with access doors at every junction.
Plenum boxes and diffuser collars
Custom plenum boxes for AHUs and terminal units, diffuser collars sized to grille spec, transitions to match existing trunk dimensions.
Spiral ducts
Spiral ducts where exposed-spec installs require a clean visible finish — restaurants, retail and architectural ceilings.
Sealed-joint construction
TDC, TDF and slip-and-drive joint systems sealed for DCD compliance. Insulation-ready outer surface, clean and deburred for foil or elastomeric application.
Standard lead times
Outsourced duct fabrication in Dubai typically runs 7–14 working days for standard scope. We do most of the same scope in 1–3 days because the workshop is ours.
Small modification
One transition, one takeoff — 1–2 working days.
Apartment fit-out duct run
2–3 working days from approved drawing.
Office fit-out (2,000–5,000 sqft)
3–7 working days depending on complexity.
Large commercial fit-out (10,000+ sqft)
7–14 working days, often split into staged deliveries to suit programme.
Custom plenums and specials
Add 2–4 working days. Rush turnaround available for critical-path fit-outs — flag it on the WhatsApp quote.
How we price duct manufacturing
Per square metre of duct surface area for fabrication. Installation priced separately or as part of an MEP scope. Dampers, fire dampers and access doors priced per unit.
What drives the price
- Gauge required — heavier gauge raises material cost
- Complexity — transitions and offsets cost more than straight runs
- Quantity — volume discounts apply on larger jobs
- Access doors, dampers and special detailing — per unit
- Lead time — rush turnaround priced higher
Who we fabricate for
- Fit-out contractors who want reliable fabrication without a third-party middleman
- MEP contractors outsourcing duct scope
- Property owners running their own fit-out
- Restaurant and retail operators during renovation
- Building MEP teams during modification or expansion
6-month workmanship warranty
Joint failures, seam splits and dimensional errors traceable to our fabrication are covered for 6 months. Covers labour and remake. Manufacturer warranties on dampers and accessories pass through to you directly — 0 to 10 years depending on the product.
Areas we cover
Same-day reach across Dubai. Tap your area for landmarks, communities and the services we deliver there — or tell us your building on WhatsApp.
Send drawings for a fabrication quote
WhatsApp or email your DWG, PDF or BOQ and we come back with a written fabrication quote within 2–5 working days. Standard runs ship in 1–3 working days from drawing approval.