Duct Installation in Dubai

New duct installation for office fit-outs, retail, restaurants, villa renovations and HVAC upgrades across Dubai. Hangers, supports, joint sealing, balancing dampers, terminal connections. SMACNA-aligned. Ducts fabricated in our own in-house workshop — 1–3 day standard fabrication lead time.

4.8 · 150+ Google reviews 9,000+ jobs since 2019 In-house duct workshop 6-month workmanship warranty
Duct Installation
Install · seal · balance · commission SMACNA-aligned · in-house fabrication · 6-month workmanship warranty

What we install

A full duct installation scope — from hangers and supports through dampers and terminal units to balancing and a handover-ready commissioning report.

check_circle

Galvanised sheet metal ducts

Rectangular and round galvanised ducts, fabricated in our workshop. Spiral ducts where exposed-spec installs require a clean finish. Flexible ducts for terminal connections only.

check_circle

Hangers, supports and isolators

Hangers, threaded rods and supports sized to duct weight and span. Vibration isolators where ducts run adjacent to mechanical equipment.

check_circle

Transitions, offsets and elbows

Fabricated to drawing for tight ceiling voids and field-fit conditions. Same-day modification when the field doesn't match the drawing.

check_circle

Dampers, fire dampers and access doors

Volume control dampers, manual and motorised dampers, DCD-approved fire and smoke dampers, access doors at every junction and at all VCDs.

check_circle

Terminal boxes and diffusers

VAV and CAV terminal boxes, diffuser plenums and grilles. Sealed to spec, ready for ceiling installation.

check_circle

Sealant and DCD compliance

Foil sealant on every joint to DCD compliance. TDC and TDF connection systems for higher-pressure runs. Fire-rated assemblies where DCD requires.

check_circle

Air balance and commissioning

Air balance with calibrated anemometer, damper position documentation, balancing report formatted for handover.

Why in-house manufacturing changes the install

When the duct workshop is in-house, installation and fabrication are one team. That changes lead time, quality control and how field-fit issues get handled.

Same-day field modification

A transition that doesn't quite fit the in-situ run gets re-cut on the spot rather than re-ordered from a third-party fabricator.

1–3 day fabrication lead time

Most Dubai contractors outsource to Al Quoz or Jebel Ali fabricators, with 7–14 day standard lead times. We do most standard scope in 1–3 days.

Single team accountable

Fabrication and install are the same crew. Joint failures and dimensional issues don't get passed between two contractors.

No middleman markup

Third-party fabricators add 15–25% over their cost. Doing it ourselves keeps that margin out of your project.

How we price duct installation

Per square metre of duct surface area for fabrication and install, plus per-unit pricing for dampers, fire dampers, access doors and terminal boxes. Fixed-price written quote against your drawings.

tune

Indicative price brackets

  • Standard rectangular duct fabrication + install: AED 250–450 per sqm
  • Spiral duct fabrication + install: AED 350–600 per sqm
  • Fire-rated duct fabrication + install: AED 600–1,200 per sqm
  • Volume control damper (per unit): AED 350–850
  • Fire damper, DCD-approved (per unit): AED 850–2,500
  • Access door (per unit): AED 200–450
  • Balancing and commissioning report: AED 2,500–12,000

6-month workmanship warranty

Joint failures, seam splits, dimensional or installation errors traceable to our work are covered for 6 months. Covers labour and remake. Manufacturer warranties on dampers and equipment pass through to you directly — 0 to 10 years depending on the product.

Get a duct installation quote

WhatsApp or email your drawings — DWG, PDF or BOQ. We confirm scope, fabricate in 1–3 days for standard runs, and install around your fit-out programme.