Duct Installation in Dubai
New duct installation for office fit-outs, retail, restaurants, villa renovations and HVAC upgrades across Dubai. Hangers, supports, joint sealing, balancing dampers, terminal connections. SMACNA-aligned. Ducts fabricated in our own in-house workshop — 1–3 day standard fabrication lead time.
What we install
A full duct installation scope — from hangers and supports through dampers and terminal units to balancing and a handover-ready commissioning report.
Galvanised sheet metal ducts
Rectangular and round galvanised ducts, fabricated in our workshop. Spiral ducts where exposed-spec installs require a clean finish. Flexible ducts for terminal connections only.
Hangers, supports and isolators
Hangers, threaded rods and supports sized to duct weight and span. Vibration isolators where ducts run adjacent to mechanical equipment.
Transitions, offsets and elbows
Fabricated to drawing for tight ceiling voids and field-fit conditions. Same-day modification when the field doesn't match the drawing.
Dampers, fire dampers and access doors
Volume control dampers, manual and motorised dampers, DCD-approved fire and smoke dampers, access doors at every junction and at all VCDs.
Terminal boxes and diffusers
VAV and CAV terminal boxes, diffuser plenums and grilles. Sealed to spec, ready for ceiling installation.
Sealant and DCD compliance
Foil sealant on every joint to DCD compliance. TDC and TDF connection systems for higher-pressure runs. Fire-rated assemblies where DCD requires.
Air balance and commissioning
Air balance with calibrated anemometer, damper position documentation, balancing report formatted for handover.
Why in-house manufacturing changes the install
When the duct workshop is in-house, installation and fabrication are one team. That changes lead time, quality control and how field-fit issues get handled.
Same-day field modification
A transition that doesn't quite fit the in-situ run gets re-cut on the spot rather than re-ordered from a third-party fabricator.
1–3 day fabrication lead time
Most Dubai contractors outsource to Al Quoz or Jebel Ali fabricators, with 7–14 day standard lead times. We do most standard scope in 1–3 days.
Single team accountable
Fabrication and install are the same crew. Joint failures and dimensional issues don't get passed between two contractors.
No middleman markup
Third-party fabricators add 15–25% over their cost. Doing it ourselves keeps that margin out of your project.
How we price duct installation
Per square metre of duct surface area for fabrication and install, plus per-unit pricing for dampers, fire dampers, access doors and terminal boxes. Fixed-price written quote against your drawings.
Indicative price brackets
- Standard rectangular duct fabrication + install: AED 250–450 per sqm
- Spiral duct fabrication + install: AED 350–600 per sqm
- Fire-rated duct fabrication + install: AED 600–1,200 per sqm
- Volume control damper (per unit): AED 350–850
- Fire damper, DCD-approved (per unit): AED 850–2,500
- Access door (per unit): AED 200–450
- Balancing and commissioning report: AED 2,500–12,000
6-month workmanship warranty
Joint failures, seam splits, dimensional or installation errors traceable to our work are covered for 6 months. Covers labour and remake. Manufacturer warranties on dampers and equipment pass through to you directly — 0 to 10 years depending on the product.
Areas we cover
Same-day reach across Dubai. Tap your area for landmarks, communities and the services we deliver there — or tell us your building on WhatsApp.
Get a duct installation quote
WhatsApp or email your drawings — DWG, PDF or BOQ. We confirm scope, fabricate in 1–3 days for standard runs, and install around your fit-out programme.