Snag Repair & Handover Defects in Dubai

You took handover from Emaar, Damac, Sobha, Nakheel or Meraas, did the inspection, and found a snag list — cracked tiles, paint defects, kitchen carpentry, plumbing leaks, AC commissioning gaps. Developer rectification windows are tight or already closed. We resolve developer snags and post-handover defects across apartments, villas and townhouses — fast, before move-in or before the unit goes to tenants. Most snag lists complete in 3–7 working days. Fixed-price written quotes. 6-month workmanship warranty.

4.8 · 150+ Google reviews 9,000+ jobs since 2019 Most snag lists in 3–7 working days 6-month workmanship warranty
Snag Repair & Handover Defects Dubai
Apartments · villas · townhouses · 6+ trades in-house Most lists complete in 3–7 working days · 6-month workmanship warranty

What we fix on a typical handover snag list

Most developer snag lists cross 4 to 7 trades — finishes, MEP, joinery, waterproofing. Rather than coordinating that many subcontractors with separate priority lists, you get one in-house team with one accountability line. The list below maps the common categories.

check_circle

Tile and floor finishing defects

Cracked tiles, hollow tiles, grout failures, level mismatch at thresholds and skirting gaps. Cut-out and re-lay where the substrate has failed; grout repair where the tile is sound.

check_circle

Paint and plaster defects

Touch-ups, full re-coats on failed walls, primer failure, peeling, plaster cracks at structural joints and wallpaper seam separation. Colour-matched to the developer specification.

check_circle

Door, lock and hardware alignment

Internal door alignment, lock and latch adjustment, threshold gaps and ironmongery defects. Sound-seal stripping replaced where missing.

check_circle

Kitchen and wardrobe carpentry

Cabinetry alignment, hinge adjustment, handle defects, wardrobe runner and soft-close failures, built-in closet shelving and drawer-front issues. Common across new-handover wardrobes that have been factory-fitted without final adjustment.

check_circle

AC commissioning and balancing

Units not cooling to spec on handover usually trace to a gas charge issue, blocked drain or commissioning gap. Diagnosis and correction so the system delivers manufacturer-rated capacity from move-in.

check_circle

Plumbing leaks and drainage

Concealed leaks, fixture joints, dishwasher and washing-machine connections, drain blockages from construction debris and visible-pipe-trap defects. Pressure-tested where needed.

check_circle

Electrical commissioning gaps

Socket polarity, MCB tripping under normal load, lighting commissioning and DEWA-meter readings vs unit-metering discrepancies. Resolved without disturbing the cabling layout.

check_circle

Bathroom and wet-area waterproofing

Leaks around shower trays, WC pans and basin connections; balcony, terrace and kitchen splash-zone waterproofing gaps. Critical to resolve before tile lifts or paint failure spreads downward into the unit below.

check_circle

Move into an AMC for the first year

Most owners taking handover roll the unit straight into a Residential AMC — scheduled servicing, priority dispatch and warranty cover across all trades for the first year of occupation.

How we work a snag list

Five steps designed to fit inside the standard 30 to 90 day developer-handover-to-move-in window. Most lists are resolved before the keys go to tenants.

Send the snag list

WhatsApp the developer's snag PDF, your inspection photos or a written summary. Many short lists are quoted from photos without a site visit.

Same-day assessment and indicative price

We respond same day with a rough scope and indicative price. If a site visit is needed we book within 24 to 72 hours.

Fixed-price written quote

Trade-by-trade breakdown, per-item line items where useful, and a delivery window. Once approved, the price is fixed unless scope changes.

Execution in 3–7 working days

Empty unit means we work full days without disruption. Multi-trade team on site together — finishes, MEP, joinery and waterproofing in one sequence rather than seven contractor visits.

Handover with photo proof per item

Photo proof against each line of the original snag list, plus a 6-month workmanship warranty on every fix. Paper trail kept in case of later developer dispute.

How we price snag repair

Fixed-price written quote before any chargeable work, costed against the developer's snag list line by line. Short lists are quoted from photos. VAT-registered invoicing.

tune

Indicative brackets

  • Light snag list (5–10 items, apartment): AED 1,500–4,500
  • Standard snag list (15–30 items, apartment): AED 4,500–12,000
  • Heavy snag list (40+ items, apartment): AED 12,000–25,000
  • Villa snag list (50+ items): AED 25,000–75,000
  • Major defects (waterproofing failure, structural): quoted on site survey
forum

How to get a quote

WhatsApp the developer name, community, unit type and the snag list (PDF, photos or written summary). Same-day response with an indicative price; fixed-price written quote within 1 to 3 working days once scope is confirmed.

Workmanship and material warranties

Two layers on every snag-repair job. Workmanship is ours across every trade on the list; material warranties on paint, sanitaryware, waterproofing systems and ironmongery pass through from each manufacturer.

workspace_premiumWorkmanship warranty

6-month workmanship warranty — if the same issue returns within 6 months due to our work, we fix it at no cost. Covers labour only.

Single warranty across tiling, painting, plumbing, electrical, AC, joinery and waterproofing — not a separate one per sub-trade. One number to call if anything recurs.

verifiedMaterial warranties

Manufacturer warranties on paint systems, waterproofing membranes, sanitaryware, AC equipment and ironmongery pass through to you directly — typically 0 to 10 years depending on the product. Exact terms confirmed before work begins.

JotunDuluxSikaBASFDaikinGeberitGroheSchneider

Send us your developer snag list

WhatsApp the developer name (Emaar, Damac, Sobha, Nakheel, Meraas), the community and unit type, and the snag list itself — PDF, inspection photos or a written summary. Same-day response. Most lists complete in 3 to 7 working days so the unit is ready before move-in or first tenant handover.