Office Fit-Out in Dubai

End-to-end office fit-out from shell-and-core to handover. Partitioning, ceilings, MEP, joinery, finishes and signage. Authority approvals coordinated — Building Management NOC, Dubai Municipality, Dubai Civil Defence, DEWA, free-zone authority, developer NOC. Fixed-price BOQ within 7 working days of site survey. 6-month workmanship warranty.

4.8 · 150+ Google reviews 9,000+ jobs since 2019 Founded 2019 · 15+ team 6-month workmanship warranty
Office Fit-Out Dubai
Partitioning · MEP · joinery · finishes BMC · DM · DCD · DEWA · free zone — approvals handled

Fit-out scope

Architectural, MEP, joinery, finishes, ELV and approvals — all under one contract, run by one in-house team. In-house duct manufacturing workshop cuts MEP lead time vs subcontracted duct fabrication.

check_circle

Architectural

Glass and gypsum partitioning, demountable partitions, suspended ceilings, raised flooring, doors, glazing, wall cladding and signage substrates.

check_circle

MEP — mechanical, electrical, plumbing

AC re-zoning and ductwork (in-house duct workshop), VRF/FCU coordination, electrical DB and circuits, plumbing for tea points and bathrooms, fire-suppression integration.

check_circle

ELV — structured cabling and AV

CAT6 structured cabling, AV, alarms, access control. Coordinated with the MEP first-fix so the cable trays and conduit are in place when civil work starts.

check_circle

Joinery

Reception counters, meeting-room joinery, cabinetry, shelving, bespoke executive desks and pantry units. In-house carpentry team coordinates with painting and electrical scope.

check_circle

Finishes

Painting (Jotun, Dulux), flooring (vinyl, carpet tile, ceramic, marble, epoxy), wall finishes, lighting design (linear, downlight, accent), glass film and branding elements.

check_circle

Duct manufacturing and installation

In-house duct workshop. Fabrication, installation, modification and insulation. 1–3 day fabrication lead time vs 7–14 days outsourced.

check_circle

Authority approvals

Building Management NOC (always the first submission), DM, DCD, DEWA, developer NOC (Emaar, Nakheel, Meraas, Damac), free-zone authority (DMCC, DIFC, DAFZA, JAFZA).

check_circle

Post-handover Commercial AMC

Optional handover into a Samra Commercial AMC for ongoing scheduled maintenance and priority dispatch after move-in.

Districts and free zones we work in

Each district has its own approval pathway and building-management quirks. Familiarity matters because the approval timelines are usually longer than the construction.

apartment

Business Bay

Prime Tower clusters, Bay Square, Bay Avenue. DM mainland approval pathway. Most building managements want fit-out NOC before work starts.

location_city

DIFC

DIFC Authority approval (separate from DM). Stricter base-build coordination. Plan 4–8 weeks of approval lead time.

business

Dubai Marina & JLT

Mainland or free zone (DMCC) depending on tower. Premium-tier finishes common. Service-lift booking discipline matters in the busier towers.

foundation

Downtown / SZR

Mixed mainland and Emaar-management properties. Burj Khalifa-area buildings tend to have stricter contractor-vetting requirements.

factory

Free zones (DMCC, DAFZA, DSO, TECOM, d3)

Each free zone has its own fit-out approval process. We have done work in all of these; familiar territory.

business_center

JBR, Jumeirah, Al Quoz, Internet City, Media City, JAFZA

Mixed mainland and free zone. Coordination patterns vary by tower and authority.

Typical timeline — 8–12 weeks for standard scope

Approvals add 4–8 weeks at the front; construction itself usually 4–8 weeks for a typical mid-size office. We sequence approvals and procurement in parallel to compress the programme.

Site survey + design proposal

3–7 working days. Walk the space, scope discussion, base-build conditions documented. Concept drawings prepared or your designer's drawings reviewed.

Fixed-price BOQ

7 working days from survey. Trade-by-trade breakdown, materials line-itemised, approval-fees pass-through.

Drawings (architectural + MEP)

7–14 working days. Sent in parallel to BMC NOC submission so the two run concurrently.

BMC NOC + authority submissions

14–28 working days. DM + DCD + DEWA submitted in parallel. Free-zone or developer NOC where applicable.

Construction

28–56 working days depending on sqft and finish tier. Sequenced civil → MEP first-fix → finishes → MEP second-fix.

Snag, handover, building NOC

5–7 working days. Snag-list closure, walk-through, building management closure NOC, as-built drawings issued, workmanship warranty starts.

How we price office fit-outs

Fixed-price BOQ once we have seen the space and reviewed drawings. The approvals timeline is the part most clients underestimate.

request_quote

Fixed-price BOQ

Site visit + concept review, then a detailed BOQ within 7 working days. Trade-by-trade breakdown, materials line-itemised, approval-fees pass-through. Once signed, the price is fixed unless you change scope.

tune

Indicative price brackets

  • Standard office spec: AED 800–1,500 per sqft
  • Premium / branded office spec: AED 1,500–3,000 per sqft
  • Flagship / executive floor: AED 2,500–5,000+ per sqft
  • Drivers: approvals complexity, MEP loads, bespoke joinery, glazing scope, after-hours work
forum

How to get a quote

WhatsApp the building name, floor, area (sqft) and your timeline target. Site visit then BOQ within 7 working days. Approval lead times factored in.

Workmanship and material warranties

Two layers across the entire fit-out. Workmanship is ours across all trades; material warranties on partitions, AC equipment, lighting and sanitaryware pass through from each manufacturer.

workspace_premiumWorkmanship warranty

6-month workmanship warranty — if the same issue returns within 6 months due to our work, we fix it at no cost. Covers labour only.

Single warranty across civil, MEP, joinery and finishes — not separate ones per sub-contractor. Accountability consolidated by design.

verifiedMaterial warranties

Manufacturer warranties on equipment, partitions, finishes, joinery hardware and lighting pass through to you directly — typically 0 to 10 years depending on the product. We confirm exact terms before work begins.

DaikinABBSchneiderKnaufArmstrongTarkettGeberitPhilipsHoneywell

Send your floor plan for a BOQ

WhatsApp the building name, floor and area (sqft) plus your timeline target. Free site visit, fixed-price BOQ within 7 working days of survey. BMC, DM, DCD, DEWA and free-zone NOCs coordinated as part of the contract.